Wick Drain Guide Specification (Method) - First Edition: Difference between revisions
Jump to navigation
Jump to search
m (Changed the format of the date) |
m (Changed format of link to pubs store) |
||
| Line 5: | Line 5: | ||
|param3=Martin G. Taube, P.E., P.G., Ground Improvement Committee Chair and Matthew Barendse, P.E., Committee Member | |param3=Martin G. Taube, P.E., P.G., Ground Improvement Committee Chair and Matthew Barendse, P.E., Committee Member | ||
|param4=v1 | |param4=v1 | ||
|param5=https://www.dfi.org/publications/single-pub?pubid=16904&bundle=1 | |param5= [https://www.dfi.org/publications/single-pub?pubid=16904&bundle=1 DFI Publication Store] | ||
|param7=Ground Improvement, Wick Drains, Methods | |param7=Ground Improvement, Wick Drains, Methods | ||
}} | }} | ||
The provided method specification for wick drains is intended as a guide. The Engineer should review it carefully and make the necessary adjustments to account for the size, complexity, conditions and specific requirements of the project. This work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specified herein. [[Category:Ground Improvement]] | The provided method specification for wick drains is intended as a guide. The Engineer should review it carefully and make the necessary adjustments to account for the size, complexity, conditions and specific requirements of the project. This work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specified herein. [[Category:Ground Improvement]] | ||
[[Category:Guidance Document]] | [[Category:Guidance Document]] | ||
Revision as of 18:36, 7 September 2023
Wick Drain Guide Specification (Method) - First Edition
| Publication Date: | February 1, 2014 |
|---|---|
| Publication Type: | Guidance Document |
| Committee/Group: | DFI Ground Improvement Committee |
| Authors: | Martin G. Taube, P.E., P.G., Ground Improvement Committee Chair and Matthew Barendse, P.E., Committee Member |
| Version: | v1 |
| Publication Link: | DFI Publication Store |
| Keywords: | Ground Improvement, Wick Drains, Methods |
The provided method specification for wick drains is intended as a guide. The Engineer should review it carefully and make the necessary adjustments to account for the size, complexity, conditions and specific requirements of the project. This work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specified herein.